Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. 4.1GNBs liability is limited to the repair of the defect or, at GNBs option, the replacement of the defective parts. Charger connected to high AC voltage. Large easy to read LEDs, three button keypad and LED display report on charger and battery status. corresponds to the voltage indicated inside the battery symbol on the LCD Display. portion of output connector or un-insulated battery terminal. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS Pages 21-31 Instr. It can be inferred that the charger fault is caused by the control board. - B 170 77.1 7 10 6 8 3.5 5 C.F. The charger will automatically charge a battery per the Ah rating set at the factory. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. Copyright 2021Exide Technologies. 1.2The charger is used under conditions for which it was designed and is not subject to misuse, negligence or accident. 1. 0 SCR100 Charger - Exide Technologies - YUMPU EXCESSIVE EQUALIZING MAY DAMAGE THE BATTERY. #>U 9.1.2.2 80 % CHARGED LED 9.1.1 DELAY STAGE 9.1.1.1 This LED indicates that the charger is ON. Lead-acid battery safety precautions and storage instructions, Electric forklift battery repair work list, About battery forklift charging battery cover to open the problem. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. If any shipping damage or partial loss is found, file a claim with the carrier without delay and take any necessary steps to protect your rights. Please read this manual completely and convey instructions to all, personnel concerned. Contact us for help. If the voltage at any location is incorrect, it can be determined that the transformer is faulty. The stud is designed for a 3/16 hardware. NOTE:These options require different control cards per drawing 4120-65-68650-05 (see Appendix B, pages 2131). Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. Do not expose the charger to rain or snow. The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. Electric stacker battery charging considerations. h)This charger is factory set to charge flooded lead-acid batteries only. NOTE: The following applies to three phase chargers only: if the charger indicates FAC or F3 upon start-up, it means that there is a low or high AC voltage (+35%) or AC phase missing. During the last six (6) years of the ten (10) year warranty on power transformers, SCR's and silicon diodes, GNB will bear costs of parts replacement only; no labor or other services will be provided by GNB. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. to endanger life, so insulated, shrouded connectors must be fitted. The charger is used under conditions for which it was designed and is not subject to misuse, negligence or accident. The generator should have, load step immunity to prevent undershoot and overshoot with, typical loads. SHOW LESS . hbbd``b`@i&`,? John Brodie, 65, suffered DRIVERLESS/AUTOMATED MATERIALS HANDLING - April 2023. %PDF-1.6 % member exclusive content. All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. j)Do not disassemble the charger. 2100 HP. The generator must be capable of at least four, times the input power requirements of the charger, failure to do so, can result in damage to the charger. The SCR100 battery charger can come with a factory installed Remote Stop / Equalize assembly option (partnumber V16-31365-50) in case the charger is out of reach for the operator. It will then enter into force 20 days later and start applying after 42 months - allowing plenty of time for the industry to implement the changes and for standardisers to produce or update the necessary harmonised standards. WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY, 120 VAC CONFIGURATION (120/208/240V INPUT), 208 VAC CONFIGURATION (208/240/480V INPUT), 208 VAC CONFIGURATION (120/208/240V INPUT), 240 VAC CONFIGURATION (208/240/480V INPUT), 240 VAC CONFIGURATION (120/208/240V INPUT), 480 VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT), 240VAC CONFIGURATION (208/240/480V INPUT), 480VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT) (SCR100-XX-YYYT1Z ONLY), 240VAC CONFIGURATION (208/240/480V INPUT) (SCR100-XX-YYYT1Z ONLY), 480VAC CONFIGURATION (208/240/480V INPUT) (SCR100-XX-YYYT1Z ONLY). STONE, BRICK, CONCRETE OR METAL. Exide Depth Charger codes C=01 & E=05 - Forkliftaction EXCEPT AS STATED ABOVE, ALL OTHER WARRANTIES AND CONDITIONS, EITHER EXPRESS OR IMPLIED, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE EXCLUDED AND ORIGINAL USER ASSUMES ALL RISK AND LIABILITY RESULTING FROM USE OF THE PRODUCT. 2.0 INTRODUCTION The GNB SCRFLX battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. A Division of Exide Technologies SALES - SERVICE - RECYCLING TOLL FREE . The charger should be. According to the French ministry of foreign affairs, about 90 million international visitors visited in France in 2019, and tourism makes up 8% of the country's gross domestic product. They are designed to charge flooded lead-acid batteries only. CAUTION: USE MINIMUM 75C WIRING. The GNB SCR100 battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. This change should be done by a qualified electrical contractor. b) Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. 1. GNB and its authorized representatives shall not be liable for direct or indirect, special or consequential damages in excess of such repair or replacement. 1. 9.1.7. Ensure that the 220V AC mains power supply has electricity and the link is reliable; the battery voltage is not lower than 20V (the charger will automatically protect and stop working below 20V). a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. In the "OFF" position, the door can be opened but only AC power at the input of the switch is present while everything downstream is dead. The SCR100 battery charger can come with a factory installed Remote Stop / Equalize assembly option (partnumber V16-31365-50) in case the charger is out of reach for the operator. The inspection and maintenance of the charger is very important in the daily use of the electric forklift. For an equalize charge cycle, the current value is displayed as [ xx.xx E). Operating Instructions and Safety Precautions for the 2100LP & 2100HP Chargers Safety Careful consideration must be taken when connecting this charger to a generator. For proper connection, torque the screws to approximately 25 inch-pounds. STONE, BRICK, CONCRETE OR METAL. To restart the charger, plug in the next battery. PDF Sales - Service - Recycling Scr200 Series Industrial Battery Chargers 1 Subscribe Now to access Operating environment should not contain any contaminations that may cause corrosion or contamination that would degrade the performance of a charger. Do not expose the charger to rain or snow. The charger is used exclusively by the original user and by no other persons. Repair or clean battery lugs. Following that, check Table 3 (pages 11-12) for the correct size of AC input fuses. INSTALLATION & OPERATING INSTRUCTIONS SCR FLX SERIES INDUSTRIAL BATTERY CHARGERS. The charger comes with a fuseblock rated big enough to accommodate the highest possible current and voltage for that particular model. The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. Australias Bestrane has secured a contract with British grocery delivery company Ocado, one of the worlds largest online grocers. Appropriate measures must be taken to, Incorrect use of a charger or maladjustment of its controls can, damage a battery. Technical specifications Exide 12/5.5 TEMPERATURECOMPENSATING INCLUDED CAUTION: DO NOT EQUALIZE MORE OFTEN THAN REQUIRED BY THE CONDITION OF THE BATTERY, AS SPECIFIED IN THE BATTERY MAINTENANCE INSTRUCTIONS. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. Final details will not be available until the legislation is published in the EU Official Journal in July. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. The product is installed and operated in accordance with generally accepted industrial standards and in accordance with the printed instructions supplied with the charger. Having trouble using the Discussion Forums? This Warranty Agreement entered into between GNB Technologies, "GNB", and the Original User in respect to GNB electric vehicle battery chargers for electric vehicle usage. Continued use of a defective charger after discovery of a defect will void all warranties. Figure 3 applies to 12 cell 475, 600, 750, 865 Ah; 18 cell 475, 600, 750, 865, 965, 1050 Ah; and 24 cell 475, 600, 750, 865Ah chargers only. The charger is NOT for outdoor use. PAGE 3. Heli forklift battery specification sheet. The charger is NOT for outdoor use. To ensure good continuity keep the contact area clean. Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. In the "ON" position, AC power is supplied to the charger but the door cannot be opened. In order to deliver the best experience please tell us where you are located. 7.1 Fault and Display Codes 8. All SCRFLX battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. TABLE OF CONTENTS TITLE PAGE 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS 2 2.0 INTRODUCTION 3 3.0 RECEIVING CHARGER 3 4.0 LOCATION AND INSTALLATION OF CHARGER 3 4.1 Stacking 3 5.0 AC ELECTRICAL SUPPLY 3 5.1 AC Fuse Mounting 3 5.2 Input Voltage Change 3 5.3 AC Voltage Connections 7 5.4 Ground connection 7 6.0 DC OUTPUT 7 7.0 APPLICATION 8 7.1 Display and Fault Codes 8 7.2 Options 8 TABLE 2 - SINGLE PHASE RATINGS 9 TABLE 3 - THREE PHASE RATINGS 11 8. NOTE: Use only identical replacement fuses obtainable from your GNB service representative. If the output voltage of the rectifier module is normal, then perform the main circuit charge detection, plug the battery plug, start charging, measure the current with the clamp current meter, if there is a certain charging current (the current value varies with the battery power), Indicates that the entire main circuit is working properly. A red 'Fault' indicator lights if an abnormal charge indication is detected. For the first Step 2: Check if the transformer has output Home Delivery World USA 2023 - only two months left! - C 410 186 47. Any claimed defect is subject to GNB's inspection and judgment, after the defective product has been returned by the original user at its expense to GNBs designated point of shipment. PAGE 2. The charger should be located in a clean, cool, normal ambient room temperature (between +45F/7.2C and 90F/32.2C) dry and well ventilated area. CAUTION: USE MINIMUM 75C WIRING. The equipment has been f actory set and does, This product has been designed, manufactured and certified to be, in conformance with UL Standards. g)The charger is NOT for outdoor use. Indication Abbreviation Interpretation 1.00 2.00 3.00 4.00 5.00 6.00 8.00 1 hour delay set 2 hour delay set 3 hour delay set 4 hour delay set 5 hour delay set 6 hour delay set 8 hour delay set Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts CHP CHamPion Control board is set to 2.55VPC not 2. The charger must be connected to either a single phase, or three phase 50 or 60 Hertz ( 2%) AC power source. 9.1.2 9.1 SCRFLX CHARGER FUNCTIONAL DESCRIPTION CHARGING 9.1.2.1 CHARGING LED This section gives a brief description of each LED, pushbutton, and the delay function on the SCRFLX type charger front control panel. The green ground wire in the AC input wiring must be connected to the charger ground stud (Identified by a green dot and ground symbol). c)Connect or disconnect the battery plug only when the charger output is off; ALWAYS press the STOP pushbutton before unplugging the battery to prevent arcing or burning. The Remote Stop / Equalize option is available for Z model chargers B and C cabinets, 6 36 cells only. The diode file of the multimeter can also be used to determine the break. Only qualified personnel should operate or service this equipment. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. TABLE 3 - THREE PHASE RATINGS 11. Ambient. Fuses with an ampere rating of 30A or less are smaller and need fuse reducers when placed in a 60A fuseblock. 100% 8 Hour Charger Rated to fully recharge a 100% discharged battery within 8 hours. 7.0 APPLICATION The charger will automatically charge a battery per the Ah rating set at the factory. less than 7Hz with good gain and phase margins. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. This LED indicates that the battery has reached 80% charge. Step 4: Check the battery charging current 2. The charger will automatically charge a battery per the Ah rating set at the factory.